Engineering Homework Help

Engineering Homework Help. SWE 400 Colorado Technical University Atom Software Re Engineering Project

 

Key Assignment

Significant work has been completed so far in the project. The parts of the Software Reengineering Project that have been completed include the following:

  • Software Reengineering (Week 1)
  • API Evaluation (Week 2)
  • API Efficiency, Reliability, and Maintainability (Week 3)
  • Configuration and Change Management (Week 4)

The final step in completing the Software Reengineering Project is to make the changes to the application planned in other phases of the project. The changes will be made in an effort to improve the application programming interface (API) and strengthen the overall application.

For this assignment, you will use software construction techniques and tools to modify your project application and implement the changes that were planned in Week 3 of the project. You will also submit a description of the changes that were made and the techniques and tools that were used to make the changes. Finally, you will further refine the Software Reengineering Project document to produce the final version. Updates may be based on peer and instructor feedback.

The project deliverables are as follows:

  • Update the Software Reengineering Project document title page with the new date.
  • Update the previously completed sections based on instructor feedback.
  • Software Construction Tools and Techniques
    • Use at least 1 software construction technique and associated tool to perform the changes to the APIs in the application recommended in the Week 3 part of the project.
    • Submit the modified application along with a new section of the project document describing the changes that were made and the techniques and tools that were used to make the changes.
    • This is the last step of the key assignment. It should bring together all aspects of the project in 1 cohesive paper and software solution.
    • Revise the previous sections so the entire document flows and has a strong introduction and conclusion.
    • The application files will be submitted as a single ZIP file, including all source code and executable files.
  • Software Reengineering Project
    • Review the entire document for any changes and improvements that you would like to make.
    • All aspects of the document should present a cohesive report, and each weekly topic should coincide with the other weeks.
    • Ensure that this final version of the plan is sufficiently detailed to allow the reader to confidently move forward with the same changes to the application that you have recommended.
    • Any previous instructor feedback should be addressed with appropriate changes.
    • Be sure to update your Table of Contents before submission.
    • Name the document “yourname_SWE400_IP5.doc.”
  • Zip the project document and the application files together in a file named “yourname_SWE400.ZIP,” and submit the .zip file for grading.

Engineering Homework Help